What is the competitive flexible procedure?

Source last checked: 1 November 2026. Taken from the Cabinet Office guidance document, not from the text of the Procurement Act 2023.

The competitive flexible procedure is one of the competitive tendering procedures in the Procurement Act 2023: any competitive tendering procedure a UK contracting authority considers appropriate for awarding a particular public contract. It is multi-staged, the authority designs the stages itself, and the tender notice must say how it will run.

What the competitive flexible procedure actually is

It is whatever competitive tendering procedure the contracting authority decides to design, within the rules that apply to it. The guidance describes it as the second of the forms a competitive tendering procedure can take under section 20 of the Act, and defines it by what it is not: not the single-stage open procedure (guidance, page 3).

the second is a competitive flexible procedure, which is any other competitive tendering procedure the contracting authority considers appropriate for the purpose of awarding the public contract.

Guidance on Competitive Tendering Procedures, paragraph 9, page 3

That is the whole of the definition, and it is why no two of these procedures have to look alike. The guidance says the procedure replaces many of the previous more prescriptive procedures and gives authorities more opportunity and flexibility to design their own, while still having to have regard to the procurement objectives in section 12 and to meet the procedural requirements that apply, such as those on time limits and transparency (guidance, page 3). It also says that the examples it gives are not exhaustive and that authorities should not feel limited to using only those (guidance, page 10).

For a bidder, the practical consequence is that the procedure is not described in the legislation you can look up. It is described in the tender notice for your competition, and nowhere else.

When an authority must use this procedure rather than the open procedure

Whenever it wants to narrow the field before tenders come in, and in a short list of other situations. The guidance names the circumstances where an authority can only use the competitive flexible procedure: where it wishes to limit the number of suppliers before inviting tenders (section 20(4)(a)); when procuring under a dynamic market (section 34); and when reserving a public contract to supported employment providers or public service mutuals (sections 32 and 33) (guidance, page 3).

The guidance also sets a proportionality limit on the design. It says the authority must ensure the procedure as designed is a proportionate means of awarding the contract, having regard to the nature, complexity and cost of the contract, that the procedure should not be overly burdensome, and that unnecessarily complex or time-consuming procedures are potential barriers that could deter small and medium-sized enterprises and other suppliers from participating (guidance, page 4). Section 123 is quoted in the guidance as defining small and medium-sized enterprises as suppliers that have fewer than 250 staff and have a turnover of an amount less than or equal to £44 million, or a balance sheet total of an amount less than or equal to £38 million (guidance, page 4).

What the tender notice has to tell you when this procedure is used

How the procedure will run, before you commit anything to it. The guidance says the authority must set out in the tender notice how the competitive flexible procedure is to be carried out — for example, if the intention is to limit the number of suppliers generally or for particular tendering rounds or other selection processes, the criteria by which those suppliers will be chosen must be in the notice, and if the procedure is to include negotiation, that must be stated (guidance, page 10).

The guidance lists the extra items such a notice must carry where they apply (guidance, page 18). Two of them matter most when you decide whether to bid: the description of the process, including whether there may be negotiation and whether the award criteria will be refined, and the criteria that will be used to cut the field to a limited number of suppliers.

There is also a gate on the clock. The guidance says section 21(5) provides that an authority may not invite suppliers to submit tenders unless it is satisfied that the tender notice or associated tender documents contain sufficient information to allow suppliers to prepare their tenders, and that unless that information is there, the authority cannot set a deadline for submission of tenders and the tendering period in section 54 cannot commence (guidance, page 6). The information provided at the outset must be sufficiently clear and specific to let suppliers identify the nature and scope of the requirement and decide whether to submit a request to participate or a tender (guidance, page 10).

The participation stage, and who gets through it

This is the stage where the field is cut, and it only exists if the notice creates it. The guidance calls the process of limiting the number of suppliers, following submission of a request to participate, by assessing conditions of participation and any other objective criteria set out in the notice or associated tender documents, the participation stage (guidance, page 9). An authority is not obliged to have one: the guidance describes a competitive flexible procedure without a separate participation stage, where the authority decides that inviting tenders from all interested suppliers is the best approach, for example because preliminary market engagement has shown the field of suppliers to be quite small (guidance, page 16).

Where a maximum number is set, the guidance says the authority must set out in the tender notice the objective criteria to be used to determine which suppliers will be invited to participate or progress (guidance, page 12). On how many get through, the guidance says the Act does not set out a minimum number, because the minimum appropriate to ensure genuine competition will vary with the nature and complexity of the contract, the number of suppliers likely to be interested, and the length and complexity of the procedure. It then suggests that, provided enough suppliers have expressed an interest, the authority should invite at least five suppliers to progress where the procedure is straightforward with no dialogue or negotiation, and at least three where the procedure is more complex and will include extensive dialogue or negotiation (guidance, page 13).

One point here is worth more to a bidder than the rest of the stage put together. The guidance says that where a supplier cannot meet the conditions of participation, or a particular one, on initial assessment but can demonstrate that it will be able to do so at a later stage and before the award of the contract, the authority may decide — but is not required — to allow that supplier to participate or progress on the requirement that it will fulfil the conditions before award, and that if it does so it should be mindful of the requirement for equal treatment in section 12 (guidance, page 12). The guidance also warns that reducing the number of suppliers can act as a barrier to start-ups and new entrants who may have a suitable solution but lack a track record (guidance, page 12).

Negotiation, dialogue, site visits and demonstrations

All of these are optional stages the authority may build in, and the guidance defines the first two so that they are not used loosely. In the guidance, dialogue refers to a discussion between the authority and suppliers about any aspect of the procurement, and negotiation is the discussion between the authority and a supplier with a view to improving the content of tenders; it points to the Sourcing Playbook for how to conduct both (guidance, page 9).

The guidance says the authority may choose to include a site visit or demonstration, which can reduce risk by testing the deliverability of key aspects of tenders — a site visit may identify that a key supporting process has not been developed, that equipment has yet to be obtained or configured, or that systems and processes cannot cope with required peaks in volume — and may also require suppliers to deliver presentations during the procedure (guidance, page 9). Whatever form it takes, the guidance says any assessment of site visits, demonstrations or presentations must be conducted in an objective way and in accordance with the award criteria and assessment methodology (guidance, page 10).

Where negotiation is planned, the guidance is specific about what the notice has to say. In its example of a multi-stage procedure with limited negotiation, it says the tender notice must set out the authority's intention to negotiate and the specific elements that will be open for negotiation, giving price and delivery timings as examples (guidance, page 14).

How the award criteria can change while the procedure is running

They can be refined, not replaced. The guidance says section 24 allows for the refinement of award criteria set out in the tender notice or associated tender documents to support a staged competitive flexible procedure, enabling the criteria to be refined as the procedure progresses. It says what constitutes a refinement is not defined in the Act, but could include adding additional detail to existing criteria, adding related sub-criteria to existing criteria, or amending criteria weightings within a published range — and that adding new award criteria would not be permissible under section 24 (guidance, page 15).

The associated tender documents can move in the same way. The guidance says the authority may continue to update and provide fuller information in them as the procurement progresses, particularly where elements of the final documents necessarily depend on the outcomes of previous negotiations or dialogue, subject always to the section 21(5) requirement before tenders are invited (guidance, page 10). It also says that where an associated tender document is being, or may be, provided after publication of the notice, the regulations allow the authority to provide a link in the notice to the web page where it will be provided, or an explanation of how it will be provided (guidance, page 11), and that it is advisable to update the published tender notice with additional associated tender documents as these are released (guidance, page 11).

Exclusion checks come earlier in this procedure

Earlier than in an open procedure, and more than once. The guidance says section 26 provides that in all competitive tendering procedures an authority must consider whether a supplier is an excluded or excludable supplier before assessing which tender best satisfies the award criteria, and that section 27 deals specifically with excluding suppliers in a competitive flexible procedure and requires the authority to check whether a supplier is an excluded or excludable supplier before permitting it to participate. An excluded supplier must not be allowed to participate; an excludable supplier may be excluded at the authority's choice (guidance, page 11).

The checking does not stop at the door. The guidance says that if a supplier becomes an excluded supplier during the course of the procedure the authority must exclude it from progressing further, that if it becomes excludable the authority may do so, and that the authority must therefore check exclusions at the start of the procedure and prior to assessment of final tenders. Where there are multiple stages, it says authorities should also consider exclusions at key points such as an intermediate assessment of tenders, which is an assessment of tenders other than final tenders (guidance, page 11).

The preferred supplier stage at the end

It is an optional last stage with only one supplier left in it. The guidance says the authority may choose to include a preferred supplier stage involving only the supplier that has submitted the most advantageous tender, carried out before entering into the contract, which could involve clarifying or confirming commitments made in the tender or limited post-tender negotiation, and which can be useful in complex procurements to ensure an agreed understanding of how the contract will operate (guidance, page 15).

The limits on it are firm. The guidance says a preferred supplier stage should be conducted in a transparent and auditable manner, that the intention to conduct one should be set out in the tender notice and any associated tender documents, and that the authority should ensure details of key points and agreed outcomes or changes are recorded and retained (guidance, page 15). It then says the stage must not have the effect of altering the award outcome and must follow the process set out in the notice and associated tender documents, and that if the tender and resulting contract are amended as a result, the authority should consider how best to ensure transparency of those changes, for example by incorporating them in the contract award notice (guidance, page 16).

Walking one procedure through, from the bidder's side

The guidance is written for contracting authorities, so the sequence below re-reads the same paragraphs from the position of the supplier answering the notice. It is a staged procedure with a participation stage and negotiation — the shape the guidance sets out in its example of a multi-stage procedure with limited negotiation.

What you seeWhat the guidance says is happening
A tender notice appears on the central digital platform and asks for requests to participate. The notice commences the procedure, and in this procedure it is being used to invite requests to participate rather than tenders. It must already describe how the whole procedure will run (guidance, page 10).
You register interest and are assessed before you are allowed in. That registration is the request to participate; the authority checks exclusions before permitting you to participate, and assesses conditions of participation and any other objective criteria named in the notice (guidance, page 11).
You are told you are through, or that you are not. The authority should notify suppliers in a timely way as the procedure progresses, especially where a supplier will not participate or progress further, with an explanation for the decision (guidance, page 13).
You are invited to submit an initial tender, and it is scored. Initial tenders are assessed against the requirements and award criteria that apply at that point in the procedure, and suppliers whose initial tenders do not meet them may be removed if the notice said so (guidance, page 14).
The authority negotiates with you on some things and not others. The elements open for negotiation had to be named in the tender notice before the procedure began (guidance, page 14).
The criteria get more detailed between rounds. Refinement under section 24 — more detail, related sub-criteria, or weightings moved within a published range. New award criteria are not permissible (guidance, page 15).
You submit a final tender and wait. Final tenders are considered to determine the most advantageous tender, after a further exclusions check before that assessment (guidance, page 11).
You get a written account of how your tender scored. The assessment summary, which the authority must provide to each supplier that submitted an assessed tender, and which must be issued before the contract award notice is published and the contract entered into (guidance, page 7).

What this guide does not cover

Only the competitive flexible procedure, as the Cabinet Office guidance describes it. These fall outside it:

Common questions

Is the competitive flexible procedure the same as the old competitive dialogue?

No. The guidance states that there is no longer a restricted procedure, competitive procedure with negotiation or competitive dialogue procedure, but that it is possible to adopt a similar approach in practice as part of a competitive flexible procedure where that is appropriate and complies with the Act (guidance, page 3). So the shape may look familiar, but the rules you are bidding under are the ones for the competitive flexible procedure, not the old named procedure.

Do I have to submit a request to participate?

Only if the tender notice asks for one. The guidance says the tender notice in a competitive flexible procedure can be used either to invite suppliers to submit a request to participate, or to invite suppliers to submit their first or only tender (guidance, page 10). A request to participate is where a supplier registers its interest in participating, and an authority invites them when it intends to limit the number of suppliers invited to tender (guidance, page 11).

Can the authority add new award criteria after the notice is out?

Not new ones. The guidance says section 24 allows award criteria set out in the tender notice or associated tender documents to be refined as the procedure progresses, which could include adding detail to existing criteria, adding related sub-criteria, or amending weightings within a published range, and that adding new award criteria would not be permissible under section 24 (guidance, page 15).

What happens if fewer suppliers get through than the authority planned for?

The guidance says that where an authority has set out a minimum number of suppliers to participate or progress at a stage and fewer than that intended minimum remain, it may continue to proceed with those suppliers that do remain (guidance, page 12). A thin field does not automatically stop the competition.

Can we be dropped partway through, before the final tender?

Yes, if the notice said so. The guidance says it must be clear in the tender notice and any associated tender documents in what circumstances suppliers could be removed, giving as examples which award criteria have minimum requirements and will be scored on a pass or fail basis, or what objective criteria will be used to select the limited number of suppliers taken to the next stage (guidance, page 14).

Will we be told why we were dropped before we ever submitted a final tender?

The guidance says the authority should ensure timely notification as the procedure progresses, especially where a supplier will not participate or progress further, and that where a supplier is excluded or its tender disregarded the notification should include an explanation for the decision (guidance, page 13). It also advises authorities to use the same feedback structure for intermediate rounds as for assessed tenders (guidance, page 13).

Related guides

Catch the notice while the participation deadline is still open

Scalebiz extracts eligibility conditions from tender and call notices, checks the core ones — country, legal form, registration, turnover and team size — against your profile, and flags each opportunity as core conditions met or needing a manual check. Fourteen days, no card.

Start the 14-day trial

Source: Guidance on Competitive Tendering Procedures, Cabinet Office, Crown copyright 2024, published on GOV.UK under the Open Government Licence v3.0 (PDF). Page numbers above are pages of that PDF, and our copy of it was last retrieved on 1 November 2026. This guide describes what the guidance document says. It does not quote or interpret the text of the Procurement Act 2023, and sections of the Act are named here only as the guidance names them.

Written by Robert Grabarević, founder of Scalebiz. He built the radar as a tool for himself, so that he would not have to re-read the same funding rules for every application. Every guide on this site cites the regulation by section or page, so each claim can be checked against the source. About Scalebiz · Robert on LinkedIn.