Home › Tenders
TendersHow long do public tenders give you to bid?
Published 1 September 2026 · updated 1 September 2026 · 4 min read
All figures cover notices published since 1 January 2026 and were measured against the Scalebiz database on 1 September 2026. They are not a snapshot of what is open today: counting only live notices quietly removes every short deadline, because those have already closed.
Short answer: it depends on the market far more than on the sector. On the same CPV code, a US construction notice gives you 14 days and a French one 41. Every page below states the measured window for one market and one sector, and compares it with the others.
How long these deadlines run, and what the law actually requires, is covered in our guide to tender response times.
The one number that decides whether you can bid
Every public tender has a closing date, and the useful question is not how many are open but how long the typical one gives you. Across 33,257 notices published since 1 January 2026 on TED, SAM.gov and UK Find a Tender, that answer is not one number. It is a spread wide enough to decide whether a market is usable by a small team at all.
Construction is CPV division 45 in every one of these markets. In the United States the median gives you 14 days; in France, 41. Medical equipment is division 33 everywhere: 7 days in the United States, 48 in Italy. Same category, same code, a different business.
What each page carries
Each page below states four measured facts for one market and one CPV division: how many notices the cohort holds, the median window from publication to close, the share closing within fourteen days, and how many publish a contract value. Every page also compares the same CPV code across the other markets that publish enough of it, because the comparison is what turns a number into a decision.
These are cohort figures, over every notice published since 1 January 2026 — open or long closed. Counting only what is open today quietly deletes every short deadline, because those already closed, and produces a median that grows the longer you leave it.
Markets and sectors
A section is published only where the cohort holds at least 100 notices. Below that, a median is a number you should not plan against, so the page does not exist.
United States — 23 sectors
| Sector | Notices | Median | 14 days or less |
|---|---|---|---|
| Construction | 2,050 | 14 d | 50% |
| Construction materials | 1,893 | 11 d | 68% |
| Transport equipment | 1,576 | 11 d | 62% |
| Industrial machinery | 1,400 | 11 d | 76% |
| Electrical equipment | 1,314 | 12 d | 59% |
| Laboratory equipment | 800 | 8 d | 84% |
| Business services | 588 | 12 d | 64% |
| Furniture | 470 | 11 d | 67% |
| Cleaning and waste | 464 | 11 d | 66% |
| Repair and maintenance | 424 | 9 d | 77% |
| Medical equipment | 315 | 7 d | 91% |
| Communications equipment | 314 | 11 d | 69% |
| Engineering and architecture | 208 | 11 d | 64% |
| Textiles and plastics | 203 | 11 d | 75% |
| It services | 197 | 8 d | 81% |
| Food and beverage | 176 | 12 d | 86% |
| Chemicals | 172 | 11 d | 72% |
| Health and social care | 130 | 11 d | 64% |
| Mining and metals | 120 | 11 d | 84% |
| Transport support | 119 | 10 d | 71% |
| Training | 118 | 9 d | 78% |
| Office and it equipment | 105 | 7 d | 82% |
| Postal and telecoms | 102 | 11 d | 65% |
Poland — 10 sectors
| Sector | Notices | Median | 14 days or less |
|---|---|---|---|
| Medical equipment | 655 | 24 d | 35% |
| Construction | 294 | 19 d | 37% |
| Cleaning and waste | 273 | 31 d | 19% |
| Transport equipment | 228 | 28 d | 35% |
| Office and it equipment | 196 | 30 d | 31% |
| Engineering and architecture | 154 | 30 d | 27% |
| It services | 121 | 19 d | 37% |
| Energy | 117 | 29 d | 26% |
| Software | 115 | 24 d | 34% |
| Laboratory equipment | 110 | 26 d | 29% |
France — 6 sectors
| Sector | Notices | Median | 14 days or less |
|---|---|---|---|
| Engineering and architecture | 294 | 40 d | 2% |
| Construction | 263 | 41 d | 5% |
| Cleaning and waste | 181 | 40 d | 4% |
| Repair and maintenance | 156 | 40 d | 4% |
| Insurance | 152 | 45 d | 1% |
| Business services | 133 | 39 d | 5% |
Spain — 4 sectors
| Sector | Notices | Median | 14 days or less |
|---|---|---|---|
| Repair and maintenance | 141 | 32 d | 5% |
| Engineering and architecture | 125 | 37 d | 3% |
| Cleaning and waste | 120 | 32 d | 8% |
| Business services | 106 | 35 d | 3% |
Czechia — 2 sectors
| Sector | Notices | Median | 14 days or less |
|---|---|---|---|
| Construction | 150 | 29 d | 17% |
| Medical equipment | 146 | 32 d | 11% |
Romania — 1 sector
| Sector | Notices | Median | 14 days or less |
|---|---|---|---|
| Medical equipment | 108 | 34 d | 7% |
United Kingdom
Find a Tender published 460 notices in this cohort against 18,344 on TED. That is not enough to split by sector honestly, so the UK is covered by one page for the whole market: median 31 days, 10% closing inside two weeks, and two thirds publishing a contract value.
What is not here yet
- Germany. Seven German sections meet the threshold and are held back for one measured reason: in medical equipment, 68 of 130 German notices are open-house or dynamic purchasing arrangements running for years rather than single competitions. Until every German section separates those from real bidding windows, publishing them would report the wrong instrument.
- Everything between 30 and 100 notices. A further 106 market-and-sector pairs hold between 30 and 99 notices. They are measurable but thinner, and they follow once these are proven.
- Contract values in the United States. No US page can show one. The public layer of SAM.gov does not publish an estimated value at all, which is itself worth knowing before you buy a tool that claims otherwise.
This guide is one part of a bigger picture. For how this compares with the other routes — grants, tenders, guarantees, subsidised debt and equity — see business funding in the EU, US and UK.
See which of these you could actually bid for
Build a profile once and Scalebiz scores every open notice in the EU, the US and the UK against your capability, your codes and — critically — the time you have left.
Start the 14-day trialMeasured on 1 September 2026 over 33,257 notices published since 1 January 2026 in the Scalebiz database, from TED, SAM.gov and UK Find a Tender — not over the notices open on that date. Source last checked 1 September 2026: Directive 2014/24/EU Article 27 in the consolidated version of 1 January 2024. Deadlines change; always confirm on the source portal before you rely on this.